St. Lucie Nuclear Power Plant is a twin nuclear power station located on Hutchinson Island, near Port St. Lucie in St. Lucie County. Both units are Combustion Engineering pressurized water reactors. Florida Power & Light commissioned the station in 1976 and continues to operate the station. Minor shares of Unit 2 are owned by the Florida Municipal Power Agency (8.81%) and the Orlando Utilities Commission (6.08%). The plant contains two nuclear reactors in separate containment buildings. However, the plant does not have the classic hyperboloid cooling towers found at many inland reactor sites; instead, it uses nearby ocean water for coolant of the secondary system. In 2003 the Nuclear Regulatory Commission (NRC) extended the operating licenses of the St. Lucie units by twenty years, to March 1, 2036 for Unit 1 and April 6, 2043 for Unit 2. ==Extended Power Uprate== In 2012, Extended Power Uprate modifications were completed, increasing the electric output from approximately 853 MW to 1,002 MW. The project involved replacing pipes, valves, pumps, heat exchangers, electrical transformers, and generators, some of which were original components of the plant.〔http://www.myhometownnews.net/index.php?id=99433〕〔http://www.nrc.gov/reading-rm/doc-collections/news/2012/12-105.pdf〕 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「St. Lucie Nuclear Power Plant」の詳細全文を読む スポンサード リンク
|